As part of a larger gazebo restoration, Perth Art Glass was asked to repurpose 40 windows from the existing structure. The windows from the 1980s were removed carefully and brought back to our O’Connor workshop.
In the workshop they were treated to a makeover; we repaired the glass and lead as needed and resized the windows to the new specifications. The boys then installed 12 lower corner details, 8 tower windows and 20 clerestory windows into the new gazebo.